Assignment Description
- Complete detailed electrical engineering (MV/LV/ Process) and functional analysis – organic for process control software
- Production of Medium & Low Voltage cabinets, automation and networks (motor control centres, associated variators)
- Process control software
- FAT tests and simulation of sequences and regulations
- Complete electrical installation on site: power supply (MV/LV), auxiliaries, instrumentation – including local partners
- On-site electrical tests (SAT) and industrial commissioning
- Final performance tests
- Training and after-sales service.
Nature of the work carried out : LV/MV electricity and Automation/Process Control
Goal of the overall project
New cement grinding factories and cement shipping centres in Abidjan (Ivory Coast), Conakry (Guinea) and Douala (Cameroon), with a capacity of 500,000 tonnes per year.
Some key figures
- Table 2 MV (15kV/630A)
- 1 power plant 3 DG 2200 kVA for the Guinean factory
- 2 2000kVA transformers
- 3 3150 kVA transformers for MV motors
- 1 BT 5000A table for the Guinean factory (SIVACON)
- 3 MCC 3200A, withdrawable type on trolley, 120 outlets each (SIVACON)
- 36 field I/O boxes (ET200) connected via the FO network
- DCS based on SIEMENS S7-400 PLC and WinCC
- Technord library
- Accessible remotely
- 180 km of cables (energy, control and network)
- 20 km of cable and pipe trays
Results
- Realisation of the electrical project in compliance with costs, deadlines and quality to customer standards (deployment)
- Partnership with a local company for efficient electrical assembly on site
Client Activity
- Extractive industry
- Cement/Lime Production
Geographical location
- Ivory Coast, Yopougon
- Guinea, Dubréka
- Cameroun, Douala