Expertise in high-voltage connections 150kV/6.6kV

25 Feb 21Industrial electricity (HV-MV-LV), Mining and quarrying

Mission description

  • Studies, design and detailed drawings for all high, medium and low-voltage electrical installations
  • Supply, manufacture and delivery of the various components
  • On-site assembly
  • Commissioning
  • Assistance with project follow-up and plant requirements

Technord news

More articles to discover.

Syscade: feedback on an automation / process control project

The Syscade project, which recently won the jury and public awards at the Wap'Innov competition, involves developing a mobile laboratory for inspecting and characterizing nuclear waste. Background to the Syscade project For many years, a great deal of radioactive...

Adaptation of a petrochemical production unit

Find out how our teams worked with a world leader in the energy sector. Customer challenge A global player in the energy sector, our customer wanted to transform an existing petrochemical production unit in order to produce a different raw material locally.Its...

Renewable energies: wind and solar power generation

The growing presence of renewable energies in the energy mix is a major environmental challenge. Our employees in the Medium Voltage department (industrial electricity) work to make wind and solar power available to a wide range of facilities. Find out more about our...

Low-voltage project for Technord’s Industrial Electricity department

Find out how our industrial electrical experts helped install a new low-voltage mixer feeder. Customer challenge Following the success of its products, one of our customers, a major player in the industrial bakery sector, was faced with an urgent need to increase its...

Optimizing the moisture content of cement slag

The challenge In many mining and processing industries, such as the cement industry, rotary dryers are used at some stage in the process to dry large quantities of material. Controlling such a dryer presents several challenges. Firstly, the dryer consumes a lot of...

Data Science with Technord: real-time estimation of decarbonation rate

The challenge Cement production is quite complex and difficult due to the variability of raw materials, the different chemical reactions involved, and the inertia of devices such as a precalciner, a rotary kiln and a cooling system. The basic component of cement is...

Data collection and acquisition for the extractive industry

Objective Storing production data has been a must for our customers for years. But what are we really doing with this data? A number of supervision platforms can store a substantial amount of data, but this information is not always used optimally. With the arrival of...

Innovative solutions for decarbonization

In a world where the fight against climate change has become a priority, the decarbonization of industrial activities is essential. As a leader in industrial engineering, Technord offers innovative solutions to help its customers reduce their carbon footprint. Here's...

Connecting the future with wind farm electrification

This project is part of a 4-turbine wind farm.This project is in line with the "Projet de Territoire Wallonie picarde 2025", one of the objectives of whichis to make Picardy Wallonia a region of environmental excellence.It is in line with current Walloon regional...

Process modeling in the extractive industry

Find out how our Process Improvement team models the process to rationalize the amount of energy required and stabilize production. Initial situation Clinker, the basis of cement, is produced by calcining limestone around the clock. The resulting energy consumption is...