Achievements in the glassmaking sector

Heating of the roof of a tin bath (Romania)

Project

Construction of a float

Technord's Mission

  • Global electrical study
  • BT design and set-up
  • Study of the Ethernet network
  • Set-up in workshop
  • Test of boxes in workshop
  • On-site transport and set-up
  • Industrial commissioning
  • Process optimisation

Technology

  • 2 3MVA transformers
  • 30T of copper
  • 5000A circuit breaker
  • Dimmer on the Ethernet network with synchronisation
  • CUBIC 4A tables
  • 46 heating zones